Building permits in Glyfada 2026: 36 new apartment buildings

· data up to 3/11/2026

From 1 January to 3 November 2026 the first building permit was issued for 36 new apartment buildings in the Municipality of Glyfada, more than in the same period last year (27, +33%).

In numbers

New apartment buildings by month

First building permits in the Municipality of Glyfada, 2026 compared with 2025.

Month20252026
January04
February02
March25
April03
May46
June65
July53
August22
September52
October34
November20 (to 3 November)
December4–

How tall they are built

LevelsApartment buildingsShare
42261%
51028%
6411%

Levels: all floors together with the ground floor or pilotis, as on the permit form.

Renovations and small-scale works

Besides the new apartment buildings, 741 small-scale building works approvals were issued in the Municipality of Glyfada this year (614 in the same period last year, +21%). The most frequent works:

What it means for crews and suppliers

Every new apartment building is a project with dozens of jobs: excavation and frame, electrical and plumbing, insulation, windows and doors, floors, lift, painting. The date of the permit shows roughly when each trade will be needed. On the map you can see every project in Glyfada with its date and key details.

See the new apartment buildings in the Municipality of Glyfada

How we count

We count only new apartment buildings: buildings with at least 4 levels and dwellings on at least 2 floors. Each project counts once, on the date of the first building permit; revisions, updates and pre-approvals do not count as a new permit. A permit does not mean that works have started.

The figures concern the Municipality of Glyfada (not the wider area) and come from the acts of the Technical Chamber of Greece (TEE) on Diavgeia, to 3 November 2026. The works come from the Small-Scale Building Works Approvals (Law 4759/2020) that TEE posts on Diavgeia, based on the standardised catalogue of works on the form. An act may list more than one work, so it counts in each relevant category.

In the first quarter of 2025 permits were few across the country: after the Council of State ruling on the "bonuses" of the NOK (the New Building Regulation) in December 2024, the building services approved only permits without them (Parapolitika). That is why the comparison with 2025 shows a bigger change in the first months.