Building permits, February 2026: 88 new apartment buildings

· data up to 3/11/2026

In February 2026 the first building permit was issued for 88 new apartment buildings, compared with 44 in February 2025 (+100%). Attica accounted for 52 of them.

The month at a glance

Where

AreaFeb 2026Feb 2025
Attica5220
Thessaloniki regional unit52
Rest of Greece3122

Outside Attica, the regions with the most were Central Macedonia (8), Crete (8), Thessaly (5), Western Greece (5).

The municipalities with the most new apartment buildings in February:

MunicipalityNew apartment buildings
Athens8
Egaleo, Patras, Chania4 each
Marousi, Volos, Vyronas, Kalamata, Moschato-Tavros, Peristeri3 each

Renovations and small-scale works

In February, 7,792 small-scale building works approvals were issued (7,357 in February 2025, +6%). The works declared most often:

WorkFeb 2026Feb 2025Change
Insulation and waterproofing2,9141,973+48%
Interior alterations and renovations2,6522,802−5%
Painting, repairs and scaffolding2,1501,824+18%
Windows, doors, facades and openings1,0931,076+2%
Roofs, canopies and pergolas855829+3%
Heating, fireplaces and chimneys435330+32%
Fences and outdoor areas269309−13%
Pools and tanks150147+2%

For crews and suppliers

An apartment building that received a permit in February will need excavation and frame in the following months, and later electrical, plumbing, insulation, windows and doors and floors. The projects, with their address and date, are on the map; see also the figures for the year.

How we count

We count only new apartment buildings: buildings with at least 4 levels and dwellings on at least 2 floors. Each project counts once, on the date of the first building permit; revisions, updates and pre-approvals do not count as a new permit. A permit does not mean that works have started.

The works come from the Small-Scale Building Works Approvals (Law 4759/2020) that the Technical Chamber of Greece (TEE) posts on Diavgeia, based on the standardised catalogue of works on the form. An act may list more than one work, so it counts in each relevant category. Source: TEE acts on Diavgeia. The numbers are recalculated every evening, because some acts are posted late.

In the first quarter of 2025 permits were few across the country: after the Council of State ruling on the "bonuses" of the NOK (the New Building Regulation) in December 2024, the building services approved only permits without them (Parapolitika). That is why the comparison with 2025 shows a bigger change in the first months.