xtizetai.gr xtizetai.gr ΕΛ

Building permits, January 2026: 73 new apartment buildings

· data up to 3/11/2026

In January 2026 the first building permit was issued for 73 new apartment buildings, compared with 35 in January 2025 (+109%). Attica accounted for 45 of them.

The month at a glance

Where

AreaJan 2026Jan 2025
Attica4518
Thessaloniki regional unit42
Rest of Greece2415

Outside Attica, the regions with the most were Thessaly (8), Central Macedonia (7), Western Greece (4), Peloponnese (4).

The municipalities with the most new apartment buildings in January:

MunicipalityNew apartment buildings
Athens5
Volos, Glyfada, Ilioupoli, Larissa, Patras4 each
Galatsi, Kalamata3 each

Renovations and small-scale works

In January, 6,253 small-scale building works approvals were issued (5,999 in January 2025, +4%). The works declared most often:

WorkJan 2026Jan 2025Change
Interior alterations and renovations2,2942,233+3%
Insulation and waterproofing2,1731,583+37%
Painting, repairs and scaffolding1,6081,422+13%
Windows, doors, facades and openings890825+8%
Roofs, canopies and pergolas703722−3%
Heating, fireplaces and chimneys294283+4%
Fences and outdoor areas209213−2%
Excavation and building site121150−19%

For crews and suppliers

An apartment building that received a permit in January will need excavation and frame in the following months, and later electrical, plumbing, insulation, windows and doors and floors. The projects, with their address and date, are on the map; see also the figures for the year.

How we count

We count only new apartment buildings: buildings with at least 4 levels and dwellings on at least 2 floors. Each project counts once, on the date of the first building permit; revisions, updates and pre-approvals do not count as a new permit. A permit does not mean that works have started.

The works come from the Small-Scale Building Works Approvals (Law 4759/2020) that the Technical Chamber of Greece (TEE) posts on Diavgeia, based on the standardised catalogue of works on the form. An act may list more than one work, so it counts in each relevant category. Source: TEE acts on Diavgeia. The numbers are recalculated every evening, because some acts are posted late.

In the first quarter of 2025 permits were few across the country: after the Council of State ruling on the "bonuses" of the NOK (the New Building Regulation) in December 2024, the building services approved only permits without them (Parapolitika). That is why the comparison with 2025 shows a bigger change in the first months.

More articles