xtizetai.gr xtizetai.gr ΕΛ

Building permits, June 2025: 108 new apartment buildings

· data up to 3/11/2026

In June 2025 the first building permit was issued for 108 new apartment buildings, compared with 81 in June 2024 (+33%). Attica accounted for 57 of them.

The month at a glance

Where

AreaJun 2025Jun 2024
Attica5750
Thessaloniki regional unit128
Rest of Greece3923

Outside Attica, the regions with the most were Central Macedonia (15), Thessaly (14), East Macedonia and Thrace (9), Peloponnese (6).

The municipalities with the most new apartment buildings in June:

Renovations and small-scale works

In June, 8,862 small-scale building works approvals were issued. The works declared most often:

For crews and suppliers

An apartment building that received a permit in June will need excavation and frame in the following months, and later electrical, plumbing, insulation, windows and doors and floors. The projects, with their address and date, are on the map; see also the 2025 year in review.

How we count

We count only new apartment buildings: buildings with at least 4 levels and dwellings on at least 2 floors. Each project counts once, on the date of the first building permit; revisions, updates and pre-approvals do not count as a new permit. A permit does not mean that works have started.

The works come from the Small-Scale Building Works Approvals (Law 4759/2020) that the Technical Chamber of Greece (TEE) posts on Diavgeia, based on the standardised catalogue of works on the form. An act may list more than one work, so it counts in each relevant category. Source: TEE acts on Diavgeia. The numbers are recalculated every evening, because some acts are posted late.

More articles